If a maintenance notification is sent too early due to an incorrect high meter entry, the notification date can be cleared so that the notification is sent again at the right time. Clicking the X in the notification date column (as seen in the image below) will set the maintenance back to the future maintenance list.
Comments
0 comments
Please sign in to leave a comment.